About MRM
Quick facts
(As at 30 December 2009)
|
MRM commenced mining |
1995 |
|
Open pit development approval |
October 2006 |
|
Development cost |
$110 million |
|
Mine life |
Estimated 21 to 25 years |
|
Resource to be mined |
43 million tonnes |
|
Production rate |
2.1 million tonnes of ore per annum |
|
Product |
358,000 dmt (dry metric tonnes) per annum |
|
Mining |
Open pit mine using conventional drilling, blasting, horizontal bench scraping, loading and haulage methods |
|
Processing |
Flotation process producing zinc-lead concentrates |
|
Transport |
Trucked to Bing Bong loading facility, transferred to barge, then offshore loading onto ships within a designated Offshore Transfer Zone |
|
Export markets |
Poland, Japan, China |
|
Economic benefits – Northern Territory |
$175 million contribution to Gross State Product |
|
Economic benefits – Australia |
$271 million contribution to Gross Domestic Product |
|
Workforce |
203 permanent employees |
|
Open pit |
Current At completion |
|
McArthur River rechannelling |
Length – 5.5 kilometres |
|
Barney Creek rechannelling |
Length – 3 kilometres |
|
Flood protection bund |
Maximum height – 24 metres |
|
Overburden (North OEF) |
Footprint – 255 hectares |
|
Tailings Storage Facility |
Total surface area – 210 hectares |
|
MV Aburri barge |
Length – 80 metres |
*NOTE: all statistics updated annually

